image

CONSTED is a leading and pioneering enterprise with the most advanced international level in R&D, manufacturing and selling of large-scale crushing & screening plants , industrial milling equipments and beneficiation plants.

contact info

social networks

Asphalt Roadway - Verification Report Page No. of

1 Page Number - Indicate the page number of this report. 2 Fin. Project ID - Enter the Financial Project ID on which the sampled mix was placed. 3 Material No. - A four-character code obtained from the JOB GUIDE SCHEDULE that identifies each material / test. 4 Type of Mix - Indicate Asphalt mix type, e.g., FC-6, SP-12.5, B-12.5. 5 Mix Design No. - Example: SP 97-0008, SP 02-1750A.

SUBJECT: HOT MIX ASPHALT (HMA) MIXTURE DESIGN AND …

SUBJECT: HOT MIX ASPHALT (HMA) MIXTURE DESIGN AND MIXTURE VERIFICATION PROCEDURES APPROVED: /s/ John E. Rondinaro John E. Rondinaro, P.E., Director, Materials Bureau Supersedes: MM 5.16 Dated: August 2012 PREFACE Materials Method 5.16 describes New York State Department of Transportation's (NYSDOT)

NYSDOT Waterproof HMA Mix Verification - Rutgers CAIT

Mar 16, 2019· To verify for fatigue cracking, the mixture is evaluated using the Flexural Beam Fatigue test (AASHTO T321). Meanwhile, waterproof verification is done by testing compacted samples in the flexible-wall permeameter (ASTM D5084).

Section 00745 - Asphalt Concrete Pavement - Statistical ...

MDV - Mix Design Verification Pbe - Effective Asphalt Content RAM - Recycled Asphalt Material RAS - Recycled Asphalt Shingles SDC - Surface Damp Condition TSR - Tensile Strength Ratio Va - Air Voids in Compacted Mixture VFA - Voids Filled with Asphalt VMA - Voids in Mineral Aggregate WMAC - Warm Mix Asphalt Concrete 00745.02 Definitions:

Geometrical Evaluation and Experimental Verification to ...

asphalt concrete mixtures before any significant damage is initiated. A typical dense-graded Superpave mixture (12.5 mm nominal maximum ag- gregate size) is selected as a representative roadway paving mixture and used in this study to accomplish two parallel approaches: Geometrical

Balanced Mix Design for Surface Asphalt Mixtures: Phase I ...

final report balanced mix design for surface asphalt mixtures: phase i: initial roadmap development and specification verification stacey d. diefenderfer, ph.d., p.e.

Balanced Mix Design (BMD) for Asphalt Mixtures

Sep 20, 2016· Verification – basically, it is straight Superpave with verifying performance properties; if the performance is not there, start over and re-design the mix. Volumetric properties would have to fall within existing M323 limits. Example ... asphalt mixtures or binder. (There are several in the area

NYSDOT Waterproof HMA Mix Verification

HMA mixture is indeed fatigue cracking resistant and waterproof. To verify for fatigue cracking, the mixture is evaluated using the Flexural Beam Fatigue test (AASHTO T321). Meanwhile, waterproof verification is done by testing compacted samples in the flexible-wall permeameter (ASTM D5084). Hot Mix Asphalt (HMA), bridge deck,

Operations Verification Sampling of Asphalt Cement

document is a list of material codes that are contained in asphalt plants. Below is the procedure a Regional Operations Inspector will follow for Asphalt Cement verification samples from the Asphalt Mix plant: reate a "Verification" sample in SiteManager. elow are screen captures of …

Balanced Asphalt Mixture Design – A Formula for Success

•Asphalt cement 12 to 15% / Sand 70 to 83% / Pulverized carbonite of lime 5 to 15% 1905 •Clifford Richardson, New York Testing Company •Surface sand mix: passing No. 10, 15% passing No. 200, 9 to 14% asphalt •Asphaltic concrete for lower layers, VMA terminology used, 2.2% more VMA than current day mixes or ~0.9% higher binder content

Fabrication and numerical verification of two-dimensional ...

This study presents the development and verification of an in-house microstructure generator that can be used to fabricate virtual, two-dimensional microstructures of asphalt mixtures.

Inspection Checklist - Asphalt Pavement Inspection Procedures

a. Check and retain a copy of the delivery tag to ensure the mix delivered meets the approved submittal requirements. b. Determine if the asphalt has been mixed properly, by visually looking at the mix in the truck, if the largest aggregate is fully covered it is a good mix. Look for an reject the load if the following problems are observed:

MATERIALS PROCEDURE COMPACTION TESTING OF HOT …

2.1 This procedure is applicable for all items of hot-mix asphalt pavements requiring compaction testing. 3.0 DEFINITIONS 3.1 Quality ControlTesting – Testing conducted by the Contractor to monitor and control the production of their product. 3.2 Verification Testing – Testing conducted by the Division to determine specification compliance.

Mix design and performance verification of asphalt mixture ...

This paper aims to improve the service performance in Inner Mongolia cold and heavy-load asphalt pavement through research. The mix design and performance verification of Zhuozi mountain mixture is the main line, in order to get a good fit to the local situation, and …

Mix Designs - Federal Aviation Administration

The mix consisted of a #67 stone, #8 stone, #10 screenings, and bag house dust. Also, the asphalt binder was a PG 64-22. The Job Mix Formula (JMF) falls within the specification of a mix utilizing a 1' max aggregate size. The HMA design was developed using the Marshall Method.

Contractor Asphalt Mix Design Approval Procedures

targets for Asphalt Content and all mix properties at Air Voids up to 1.0% below the mix design optimum. 3.6 After an asphalt mix design is approved for use, binder changes shall be handled as follows: 3.6.1 If the Supplier remains the same, but the binder used changes, such that future binder

Materials & Testing | UDOT

Oct 06, 2020· 945 Dynamic Stripping Test of Asphalt Material Aggregate Mixtures; 954 Open Graded Surface Course; 960 Volumetric Mix Design and Verification; 961 Guidelines for Superpave Gyratory Compactor Protocol; 962 Guidelines for Stone Matrix Asphalt (SMA) Mix Design and Verification

VERIFYING THE ACCURACY OF HOT MIX PLANT ASPHALT …

6.3 Determine the rate of asphalt flow. The rate must correspond to the mixture production rate anticipated to be most common during project production. EXAMPLE: If the project mixtures will normally be produced at 200 T/hr and the design asphalt content is 5.0% by weight, then the flow rate for the test run must be: 200 T/hr x 0.05 = 10 T/hr.

Chapter 10: Verification of PP2-99 Protocol/AASHTO ...

219 CHAPTER 10 VERIFICATION OF PP2-99 PROTOCOL AASHTO DESIGNATION PP2-99: STANDARD PRACTICE FOR MIXTURE CONDITIONING OF HOT MIX ASPHALT INTRODUCTION This practice covers the accelerated aging (oxidation) of asphalt mix by means of elevated temperature. The test method is intended to simulate in-service oxidative aging of asphalt mix.

Idea 122 Test Methods for Verification of Low-Temperature ...

Research has shown that measuring the flexural stiffness of asphalt mixture beams using a bending beam rheometer (BBR) is a good way to control the low temperature properties of asphalt mixture s. However, before such a test is adopted as a specification, the repeatability and reproducibility of the testing protocol need to be verified. This ...

Asphalt Mix Design - FPA

•Prepare 1000 g of mix, cool at room temp for 24 ± 2 hrs •Bring oil bath to between 325 and 350oF •Obtain a 200 g representative sample of the mix •Fill 2000 mL beaker about halfway with distilled water and heat to boiling •Add mix sample to beaker, maintain boil for 10 m ± 30 s •Remove beaker and skim asphalt from water surface

Mix Design and Performance Verification of Asphalt Mixture ...

With the implementation of the "One Belt, one Road" national strategy, the western region traffic can develop rapidly. This paper aims to improve the service performance in Inner Mongolia cold and heavy-load asphalt pavement through research. The mix design and performance verification of Zhuozi mountain mixture is the main line, in order to get a good fit to the local situation, and draw the ...

Asphalt Mixtures | KYTC

Feb 22, 2008· Asphalt Plant Approval. For initial asphalt mixing plant approval, the contractor must submit the "Contractor's Master Certification of Asphalt Mixing Plants and related Equipment" to the Department, this form should be completed during an actual plant inspection by contractor personnel directly responsible for the plant operations. 39 kb, 11 pages, updated 04/22/2009.

2017 Contractor Mix Design Guidelines-DRAFT

CONTRACTOR MIX DESIGN GUIDELINES FOR ASPHALT CONCRETE January 2017 4 CONTRACTOR MIX DESIGN GUIDELINES For ASPHALT CONCRETE 1.0 SCOPE 1.1 The Oregon Standard Specifications for Asphalt Concrete 00744.13, 00745.13(a) and 00735.13 require the Contractor to develop the mix designs for ACP, Emulsified Asphalt Concrete (EAC),

JMF Home - California

The JMF Verification Tool is a web based application developed by the California Department of Transportation, Materials Engineering & Testing Services (METS) to evaluate asphalt concrete mix designs. It allows contractors the ability to electronically submit JMF proposals and design data, and Caltrans District Labs the ability to verify JMFs.

Balanced Asphalt Mixture Design – National Overview

•Surface sand mix: passing No. 10, 15% passing No. 200, 9 to 14% asphalt •Asphaltic concrete for lower layers, VMA terminology used, 2.2% more VMA than current day mixes or ~0.9% higher binder content 1920s •Hubbard Field Method (Charles Hubbard and Frederick Field) •Sand asphalt design

Balanced Mix Design for Surface Asphalt Mixtures: Phase I ...

The balanced mix design (BMD) method addresses this through the incorporation of performance criteria into mix design and acceptance. VDOT has committed to the implementation of the BMD method in an effort to improve asphalt mixture performance.

"Hot Mix Asphalt Mixture Design and Mixture Verification ...

The formulation of the mixture shall be done using the mixture design procedure detailed in the current Materials Method 5.16, "Hot Mix Asphalt Mixture Design and Mixture Verification Procedures" and this specification. The placement of this mixture shall be in accordance with

IDEALS @ Illinois: Prediction of in-situ asphalt mixture ...

For the asphalt mixtures without slags, the average density prediction errors of GPR were between 0.5% and 1.1% with two calibration cores, while those of …

East Valley Asphalt Committee HOT ASPHALT MIX CRITERIA

19. Percent voids in mineral aggregate of asphalt mixture. 20. Percent voids filled with asphalt of asphalt mixture. 21. Percent effective air voids of asphalt mixture. 22. Dust proportion of asphalt mixture. 23. Film thickness of asphalt mixture. 24. Mixing and compaction temperatures of the asphalt …