RCC Calculator | Estimate Cement, Sand, RCC Online Calculator

Reinforced cement concrete or RCC calculator can be used to calculate M15, M20 and M25 mix ratio of cement, sand and jelly. At materialtree.com, you can also …

Rate analysis for concrete - calculate quantity and cost ...

Aug 07, 2020· 6) labour rate and cost. Rate analysis for 1 cum concrete of M15 (1:2:4) M 15 grade of concrete have cement, sand and aggregate ratio 1:2:4 in which one part is cement, 2 part is sand and 3 part is aggregate. For quantity and cost calculation for m15 grade of …

Rate Analysis of M35 Grade Concrete (Manual and RMC)

May 18, 2021· M35 Concrete Rate Analysis. M35 Concrete is generally using for Column, Piling, PT Beam, and Long span Slab or deck Slab, where ever parking slab where slab thickness is more and moving load is maximum. as well as in highrise building up to 4th -8th slab we can use M35 concrete as per structural design. Here we had given a Rate analysis of M35 ...

Construction Materials Price List 2021 | Building ...

TMT bars or Thermo-Mechanically Treated bars are high-strength reinforcement bar having a tough outer core and a soft inner core. Steel is a high-strength material compared to concrete.The reinforcing steel is strong in tension as well in compression.It plays an important role in giving strength to structure in construction projects.. TMT steel bars are available in Fe 500 grade, Fe 500 D ...

SUPER RATE ANALYSIS

d40 - m15 grade rmc using flyash up to plinth level d41 - m10 grade rmc using flyash up to plinth level d42 - m15 grade rmc using flyash up to floor v level d43 - m10 grade rmc using flyash up to floor v level reinforced cement concrete ===== e79 - floor /wall/ roof joint of 100 mm gap e80 - …

Quantity and Rate Analysis for Reinforced Concrete ...

For rate analysis of RCC, we need to multiply each quantity with their rates to get the amount for every item of work. Rates vary from place to place and time to time. It is advisable to assume local rates or standard rates of the place. The sum total of all the four items …

Ready Mixed Concrete - Ready Mix Concrete Latest Price ...

Ready Mix Concrete. ₹ 5,200/ Cubic Meter Get Latest Price. Specifications Outline Dimension: 5226. -2200*5460 mm. - Motor Power: 17.25 kW. - Speed of Mixing Drum: 13 r/min. In order to furnish the variegated desires of our clients, we have brought forth an extensive consignment of Ready Mix Concrete Machine. Our product is developed using the ...

ASHIF A R: RATE ANALYSIS OF M15 CONCRETE

18 · Oct 06, 2015· rate analysis of m25 concrete; price list of jindal pipes; rate analysis of m20 …

Rate Analysis of M25 Grade Concrete (Manual And RMC)

Mar 05, 2021· We can also prepare this grade on-site with our normal concrete mixture, but for mixing this manually we need to know about the rate analysis of M25 grade concrete. this analysis is generally based on Mix design which is prepared by the Laboratory where we can know about the Specific gravity of the material which is very useful to prepare rate analysis of M25 grade concrete.

CONCRETE CALCULATOR

If you are unsure about the quantity of concrete needed, you can use skip this step and go to our Concrete calculator by shapes. 1 Select concrete. 2 PIN code. Select Product: Select Product Aggregate RMC Certified Mixes. 12 mm 20 mm 40 mm 53 mm CRF/CSS GSB Dry Prism Plaster Sand WMM Washed Prism M Sand Washed Prism Plaster Sand.

M30 Grade of Concrete Mix Design Procedure with OPC 53 …

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm 2. Which Cement Is Better 43 Grade or 53 Grade?

RATE ANALYSIS OF CONSTRUCTION ITEMS

Rate-Anly is advanced Windows based Rate Analysis software for Construction Applications. The software is designed such that the User can define the analysis of any item for deriving the Item Rates, in terms of Materials, Machinery, Labours and Overheads involved. New rates of these items can be worked out easily by

rate for rmc grade m - service-technique.fr

ANALYSIS OF RATES FOR DELHI. of rates of many items also incorporate element of machinery instead of the lump sum provisions, RMC / BMC, brick work in superstructure above floor V level, road work, dismantling of RCC work, dismantling, 0312 Bitumen grade PMB - 40 MT 30,00000 0313 Blown type petroleum bitumen of penetration 85/25 of approved.

What is the cost of M30-grade concrete for one cubic meter ...

Answer (1 of 4): It would vary considerably depending on which country or sometime which region you live in. I suggest calling up your closest ready mix plant to enquire about the cost. It will you a fair idea on how much it costs.

Can any one give me rate analysis for VDF flooring its ...

Aug 06, 2019· Dear Friend, Based on the grade of concrete you are going to use ( earlier M-20 was used however nowadays due to use of crushed sand instead of river sand generally M-25 grade is recommended for all VDCF.) so take quotes from RMC vendors to …

M 15 Mix Designs as per IS-10262-2009 - Civil Engineering ...

Dear All, Here i am giving the mix designs as per IS-10262-2009 which gives to change the procedure for calculating the concrete ingredients Raj Mohammad Khan M-15 CONCRETE MIX DESIGN As per IS 10262-2009 & MORT&H A-1 Stipulations for Proportioning 1 Grade Designation M15 2 Type of Cement OPC 53 grade confirming to IS-12269-1987 3 […]

ANALYSIS OF RATES FOR DELHI

1.0 C.P.W.D. Analysis of Rates for Delhi, 2007 is the revised edition of C.P.W.D. Analysis of Rates for Delhi, 1997. 2.0. DAR, 2007 incorporates most of the analysis of DAR, 1997 with all correction slips up-to date and will replace DAR, 1997. 3.0 DAR, 2007 is a bilingual document (Hindi version will follow).

Quantity of water required per 50kg bag of cement for M20 ...

Quantity of water needed per 50 kg bag of cement for M15 grade of concrete. For M15 concrete they are mixed in the ratio of 1:2:4 (1 part cement to 2 parts sand & 4 parts aggregate by volume) to gain 15 MPa strength of concrete and water should be added in the range of 60% of weight of cement in moderate exposure condition for M15 concrete.

ANALYSIS OF RATES OF VARIOUS BUILDING ITEMS.

RATE ANALYSIS FOR BRICK BAT W/P FOR TOILET. Note: 1. Material cost should include all taxes, such as sales, octroi, excise etc. 2. We have added 5 % as wastage wherever applicable. 3. Rates should include equipments, machineries, temporary approaches, water, fuel & electrical consumptions, contingencies & sundries. 4.

Cement Concrete Calculator | PCC Calculator | RCC ...

Strength of RCC is defined as compressive strength after 28 days, expressed as M15, M20, where M stands for Mix and 15 stands for 15 N/mm 2 (n/mm 2 must be read as 'Newton's per millimeter Cubed) compressive strength at 28 days. The proportions of materials (cement, sand, coarse aggregate) for nominal mix/design mix concrete that are normally used are 1:3:6 or 1:4:8.

Construction Board: Rate Analysis of M15 Concrete - Site ...

Feb 15, 2021· Rate Analysis of M15 Concrete - Site Mix And Ready Mix Concrete (RMC) M15 Concrete Rate Analysis Actually M15 grade concrete is generally using for Plain Cement Concrete (PCC). that means this grade is not using for reinforced concrete or not using in RCC.

Rate Analysis Of Concrete - M25 Concrete Example Rate Analysis

Rate-Anly is advanced Windows based Rate Analysis software for Construction Applications. The software is designed such that the User can define the analysis of any item for deriving the Item Rates, in terms of Materials, Machinery, Labours and Overheads involved. New rates of these items can be worked out easily by

Concrete(Rate Analysis) | Thermal Power Plant

What is the composition of cement ? In its simplest form, Concrete consist of the following, as depicted in the picture. How many bags of cement are used for various concrete mix ? Given number of bags are used for different concrete mix M10 :-4.8 bags M15 :- 6 bags M20 :- 7.4 bags M25…

Krishna Concrete, Kanpur - Manufacturer of Ready Mix ...

Manufacturer of Ready Mix Concrete M20 Grade, M25 Grade Ready Mix Concrete & Ready Mix Concrete M10 Grade offered by Krishna Concrete from Kanpur, Uttar Pradesh, India

Ready Mix Concrete | RMC Dealers and Suppliers in ...

Ready mix concrete online suppliers in Bangalore. Get RMC price list and customized RMC with precise mixture and grades as per your requirement for best of building construction purpose.

How much cement sand & aggregate required for M15 concrete ...

High strength concrete grade are M50,M55,M60,M65, & M70 are made according to design mix have higher compressive strength than normal and standard grade of concrete.. According to nominal mix concrete IS456 code book suggest that minimum grade of concrete is M20 which are used for RCC work and M5,M7.5, M10 and M15 are not used for RCC work, generally lower grade of concrete are used …

M25 RMC - Ready Mix Concrete Dealers in Bangalore

Buy M25 Ready mix concrete in Bangalore at High quality and lowest prices at materialtree.com. precise mixture M25 RMC suppliers. Get best deals on RMC from Materialtree.com.

Mix Design For M35 Grade Of Concrete - Civil Engineering ...

Jul 09, 2017· Select Water Cement Ratio = 0.43 for concrete grade M35 (From Fig 2. of I.S. 10262- 1982) Select Water Content = 172 Kg (From IS: 10262 for 20 mm nominal size of aggregates Maximum Water Content = 186 Kg/ M 3) Hence, Cement Content= 172 / 0.43 = 400 Kg / M 3. Formula for Mix Proportion of Fine and Coarse Aggregate: 1000(1-a 0) = {(Cement ...

Reinforced Concrete Quantity and Rate Analysis - Civil ...

Mar 05, 2017· The quantity of materials like cement, sand and coarse aggregates change according to the mix design, for example, M15 (1:2:4), M20 (1:1.5:3), M25, M30 and so on Next, the rate analysis for 1 m 3 of reinforced concrete is to be calculated.

Rate analysis for Concrete- Step by Step calculation with ...

Purpose of rate analysis. Data required to Rate analysis for Concrete. Q) Calculate the rate analysis of 10 meter cube of concrete. The concrete mix is M15. Step -1 Write all the known values of the materials. Step -2 Calculate dry volume of concrete. Step -3 Calculate volume of all materials. Step -4 Convert volume of cement into numbers of bags.